• info@rmprestation.com
  • +212 661-199785

On large-scale industrial construction sites, co-activity between different trades — earthworks, civil engineering, mechanical assembly, and steel construction — represents a major challenge in terms of safety and coordination.

During the assembly of our steel structures and conveyors, our teams continuously adapt their handling operations to adjust to the flow of site machinery and plant traffic, while maintaining a high level of risk control.

01 Our commitments for controlled co-activity
1
Systematic interruption of maneuvers Immediate suspension of lifting or load-moving operations as soon as a third-party vehicle approaches the operating area. Priority is given to situational control and personal protection.
2
Strict demarcation and zoning Physical boundary marking of handling areas and operating zones to prevent unauthorized entry and separate traffic flows.
3
Inter-company coordination Organization of synchronization meetings with the client and various contractors to coordinate activities and plan intervention windows in total safety.
4
HSE guidelines and dedicated watch Presence of rigging supervisors and personnel dedicated to traffic control (flagmen) to ensure communication, movement oversight, and compliance with HSE rules.
Safety remains our top priority

For RM PRESTATION, operational performance relies above all on a controlled organization and rigorous management of interfaces between the various stakeholders.

Meeting deadlines and production goals is never done at the expense of the safety of people, equipment, and facilities.

HSE • Co-activity • Lifting • Coordination • Safety