RM PRESTATION is carrying out the pre-assembly and installation of the conveyor system at the Tizert copper mine (Managem Group): structures, head frame, pulleys, gear motor and guardrails.
Through its subsidiary AL FARES MANUTENTION, RM PRESTATION provides a complete fleet of mobile telescopic cranes ranging from 30T to 200T, as well as a wide range of handling equipment and machinery for all your industrial, mining, and construction projects.
RM PRESTATION contributes to Managem’s strategic Tizert copper project through the prefabrication, precision hoisting, and installation of plant piping networks.
RM PRESTATION completes workshop prefabrication of custom protective metal covers for expansion joints at OCP Group’s phosphoric plant in El Jadida.
RM PRESTATION supports industrial operators through tailored preventive and corrective maintenance contracts, guaranteeing plant reliability and operational continuity.
Managing coactivity alongside heavy earthmoving equipment, RM PRESTATION enforces strict HSE protocols to ensure 100% safe lifting and assembly operations.
RM PRESTATION demonstrates its expertise in heavy boilermaking and specialized lifting with the design, hoisting, and installation of a high-capacity industrial hopper.
RM PRESTATION once again demonstrates its technical expertise through the high-precision lifting and assembly of complex steel structures on industrial sites.
RM PRESTATION supports its clients in their steel construction projects, from planning through fabrication to on-site assembly.